|
                 

  |
WHAT YOU CAN EXPECT AFTER
YOU PLACE YOUR ORDER
- You will be emailed or faxed a copy of your "General Arrangement" AUTOCAD drawing. This is the document that you approve the placement of the doors and accessories and authorize us to begin production of your building based upon the approved drawings. This is always done in a timely fashion because "Lead Time" does not begin, until we have sign and approved Order Confirmation and Approval Drawings in house.
- If you order a Submittal Package, you can expect to receive three copies of your drawings with a state certified engineers seal on them. This is so you can provide a copy to your building inspector/department and one to your Fire Marshall and keep one copy for yourself. Additional copies are available at a nominal cost to the buyer.
- If you require State Approval, please see the APPROVALS page to see you are required to have one. In our experience, the final jurisdiction is up to the local official, so many times the state approval is not required when you think it would be. Always check with your local Fire Marshall and/or Building Inspector to find out what your true needs will be regarding Approvals and Permits.
- Third Party Approvals. Both FM and Warnock Hersey are Third Party Approval Organizations that have approved all of our standard models. If a Third Party Approval is required in your state, your local official make accept the FM Sticker or Warnock Hersey Approval as such. If not, US Chemical Storage Contract with several engineering firms for these approval such as Pyramid One and T.R. Arnold and Associates. We can provide approvals for all of our buildings in all states and territories.
<<< BACK >>>
|
|
|
Visit TURFloc™.com
US Explosive Storage®
ChemicalBuildings.com
|